OPAM studies: short report and risk study

Does your site exceed the quantity thresholds of the Swiss Major Accidents Ordinance (OPAM)? We prepare your short report and, where required, the risk study, with recognised modelling and a file ready for the cantonal authority.

Discuss your file
Are you concerned?

Is your company subject to OPAM?

A company is subject to OPAM when the maximum quantity of a substance, preparation or special waste present on its premises exceeds the quantity threshold set by the Federal Office for the Environment (FOEN).

The maximum quantity adds up all possible partial quantities, according to production steps and capacities. A substance kept on site for more than 24 hours at least once a month counts as stored.

As soon as a threshold is exceeded, the holder must submit a short report to the cantonal authority.

We check for you
  • The substance inventory and classification
  • The calculation of maximum quantities
  • The comparison with FOEN quantity thresholds
  • Exceptions (fuels, heating oil, etc.)
  • The consequences for your project or building permit
Our approach

Four steps, from threshold to decision.

1

Threshold check

Substance inventory, maximum quantities and comparison with FOEN thresholds.

2

Short report

Description of the site and of the worst-case scenarios, according to FOEN guidance. Only passive protection measures are taken into account. We model the consequences and estimate the major accident index.

3

Risk study

If serious damage cannot be ruled out: isolatable sections, leak sizes, failure frequencies, bow-tie analysis, site weather data and day and night population.

4

Assessment and measures

Cumulative curve compared with the assessment criteria, then risk reduction measures until an acceptable level is reached following the ALARP principle.

Serious damage criterion

When is a risk study required?

The short report estimates the extent of damage for each scenario and converts it into a major accident index. From an index of 0.3, the damage is considered serious under OPAM and a risk study must be carried out.

Damage indicatorThreshold (index 0.3)Typical cases
Population, fatalitiesMore than 10 fatalitiesToxic dispersion, fire, explosion
Population, injuriesMore than 100 injuredHigh-activity substances
Surface waterMore than 1 million m³ of polluted waterSpills, firefighting water

Modelling with recognised software under unfavourable weather conditions, with recognised Probit functions for toxic, thermal and overpressure effects.

Risk assessment method

From OPAM short report to risk study

The short report identifies hazards and major accident scenarios. When the authority cannot rule out serious damage, it requires a risk study. The risk study follows the logic of a quantitative risk assessment (QRA). The result is a cumulative curve, compared with the FOEN assessment criteria. Where needed, risk is reduced following the ALARP principle.

SeverityConsequence modellingEffect distances, people and environment affected
×
FrequencyCause-consequence treesAnnual frequency of each scenario (per year)
=
RiskCumulative curveCompared with criteria; ALARP risk reduction where needed
Cumulative curveUnacceptable zoneIntermediate zoneAcceptablezoneOutside the scope of OPAM1E-041E-051E-061E-071E-081E-091E-101E-111E-121E-131E-141E-151E-161E-170.00.10.20.30.40.50.60.70.80.91.0Major accident index (-)Cumulative frequency (per year)
Risk reduction

Proportionate measures, following the ALARP principle.

When risk lies in the intermediate zone, the authority weighs the interests involved. We quantify each measure on the cumulative curve, so you invest where the safety gain is real.

Reduce the hazard at source

Limiting quantities, substituting a product or moderating operating conditions. This is often the most effective measure.

Reduce severity

Limiting the extent of a release and its consequences for the population and the environment.

Reduce frequency

Lowering scenario frequencies through technical and organisational barriers.

What you receive

A clear file, ready for the authority.

A structured fileA common framework report (site, population, weather, methods) and one appendix per substance: short report or risk study.
Readable resultsMapped effect distances, major accident indices and an annotated cumulative curve.
Quantified recommendationsThe effect of each measure on the risk, so you decide with full knowledge.
Ongoing supportExchanges with the cantonal service, answers to its questions and file updates.
Beyond the report
  • Emergency plans based on the study scenarios
  • New projects and new products: impact on the overall risk
  • Coordination between land-use planning and OPAM for projects near an installation
Frequently asked questions

OPAM study: your questions

When is an OPAM short report required?

As soon as the maximum quantity of a substance, preparation or special waste on site exceeds the FOEN quantity threshold. A short report is also required in building permit procedures for an installation subject to OPAM.

What is the difference between a short report and a risk study?

The short report estimates the extent of damage for worst-case scenarios, taking into account only passive protection measures such as fire walls or retention basins. If the major accident index reaches 0.3, the authority requires a risk study, which also quantifies scenario frequencies and expresses risk as a cumulative curve.

Which tools do you use for modelling?

We use EFFECTS (Gexcon), a recognised consequence modelling software, with Probit functions for toxic, thermal and overpressure effects, and failure frequency data from international references.

When must the report be updated?

When installations or quantities change, new products are introduced, the site is extended, or the population density around the site changes.

What if the risk is not acceptable?

We identify risk reduction measures, starting at source (quantities, substitution), then severity and frequency, and show their effect on the cumulative curve until an acceptable level is reached.

Do you work outside Switzerland?

Yes. We also work under the EU Seveso III directive, which pursues objectives comparable to OPAM.

See also

An OPAM report to prepare or update?

Tell us which substances and quantities are involved. We will tell you which steps apply and how we can help.

Contact form info@hazmatpartners.ch